Loading…
2 units · 110 MW
Posted each afternoon by Southwestern Power Administration, in “hour ending” terms.
Water off: midnight – 1 PM, 8 PM – midnight
When running, roughly 6,300 cfs (estimated from scheduled megawatts)
Water off: midnight – 7 AM, 9 AM – 2 PM, 8 PM – midnight
When running, roughly 2,200–6,300 cfs (estimated from scheduled megawatts)
Schedules can change without notice — power demand, transmission constraints, generator outages and inflow all move them. Never wade or anchor below a dam without checking the horn and posted warnings.
Source: USACE CWMS · SWPA