Center Hill Lake · TN
0 cfsthrough the turbines
Updated an hour ago
No turbine generation observed. Turbine discharge is 0 cfs.
Total release at dam 250 cfsan hour ago
The operating forecast published by U.S. Army Corps of Engineers, Nashville District — a plan, refreshed daily, not a commitment.
Generation forecast to start at 4 PM
Eddy last checked just now. Planned through Mon, Sep 21. Forecasts change without notice — power demand, transmission constraints, generator outages and inflow all move them. A change at the dam does not reach every downstream location at the same time. Never wade or anchor below a dam without checking the horn and posted warnings.
The past 7 days and today
Central time, at the dam. A pattern is a habit, not a promise — schedules change without notice, and a change at the dam does not reach every downstream location at the same time.
No public hourly loading schedule exists for this project — its power is marketed by the Southeastern Power Administration, which does not post one. The Corps’ own operating forecast above is the forward view.
Source: USACE CWMS
3 generating units · 135 MW nameplate
Eddy · Water data from USGS
© 2026eddy.guide · For informational purposes only